Home About Submit a Listing FAQ
Search
The Heavy Lift Directory - project cargo and freight forwarding resources
Partners
International Transport JournalITJ
Worldwide Project ConsortiumWWPC
Specialized Carriers & Rigging AssociationSC&RA
World Cargo NewsWorld Cargo News

Browse Directory
Heavy cargo experts in EuropeHeavy Lift Europe
Heavy lift specialists in Middle EastHeavy Lift Middle East
Abnormal load specialists USHeavy Lift America Canada
Heavy lift operators in South AmericaHeavy Lift South America
Heavy lift companies in AsiaHeavy Lift Asia

 

 

ANOTHER GREAT
HEAVY LIFT COMPANY
LISTED IN
THE
HEAVY LIFT DIRECTORY!

your No1. resource for

heavylift news
heavy transport providers
air charter booking
heavy cargo
heavy lift group info
project forwarding
oversized transport

© heavy-lift.com 2008

 

heavy lift germany   THE RIEDL GROUP
Riedl Group
 
heavy air transport germanyair cargo
 

TRANSGERMA ship three blocks of SIEMENS CCPP from Germany and other European countries to Rudeshur / Iran

Lifting Operation of the 310 tons Gas Turbine by a Strans Jacks Lifting System
Lifting Operation of the 310 tons Gas Turbine by a Strans Jacks Lifting System

 

The 260 tons Transformer on the 2000 km long route to Rudeshur/Iran
The 260 tons Transformer on the 2000 km long route to Rudeshur/Iran

 

spacer

During the year 2005 and 2006 TRANSGERMA shipped three blocks of SIEMENS CCPP (Combined Cycled Power Plant) from Germany and other European countries to Rudeshur/Iran, approx. 60km south west of Teheran. Each Block covered one Gas Turbine weighing 310 m/tons, one Generator weighing 320 m/tons and one Transformer weighing 260 m/tons.

All heavy items and accessories were loaded in Bremen and other ship loads were loaded in Cons-tanza and Gijon /Spain. Port of entry in Iran was Bandar Abbas. From there the only suitable road exists to the site which was a distance of approx. 2,000 km. Each block was moved in a convoy of 2 x 24 axles and 1 x 16 axles plus numerous trucks with ODC and general cargo. Our Iranian partners also effected the customs clearance for account of the client and on behalf of the owners. At the site in Rudeshur we had to lift the Gas Turbine and Generator onto foundations by means of a specially designed and built strand jack gantry. The Transformers were skid-ded and jacked onto foundations. To place the heavy components onto foundations was performed under the supervision of the site management and the Siemens service engineers. All ODC and general cargo we had to offload to ground in a designated intermediate storage area. The three CCPP and all periphery equipment for EBOP and MBOP (mechanical balance of plant and electrical balance of plant) as well as tank plant covered approx. 2.500 m/tons of heavy lifts and approx. 48.000 cbm of ODC and general cargo.

More info: Riedl Group in The Heavy Lift Directory







<< back

 

 

ANOTHER GREAT HEAVY LIFT COMPANY
LISTED IN THE HEAVY LIFT DIRECTORY !

your No1. resource for

heavy lift | heavy cargo | heavy lift news

© heavy-lift.com 2008