|
IPON NETWORK -
BREST, July 2004.
Discharging in the port of Brest of 2 complete vessels (m/v Nina) loaded with 5 complete dismantled wind energy converters.
The cargo was loaded in EMDEN. The full transport organization in France was performed by SDV OPE / LMI including stevedoring, storage and inland transportation up to the erection site of the turbines in Plouguin (29).
LA ROCHELLE, August 2004.
Discharging in the port of La Rochelle 5 wind turbines (except towers) from m/v Stoertebecker, coming from Brunsbüttel.
The stevedoring operations as well as the full transport organization, up to the erection site in St Crepin, was performed by SDV OPE local agency in La Rochelle SGMT to the full satisfactory of our customer.
more info: IPON NETWORK in The Heavy Lift Directory
|